Laserfiche WebLink
0 0 <br />Page 3 of 4 <br />1. MING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑ Professional Engineer <br />El Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used, See attached testing procedures <br />Equipment Resolution: <br />rDiameter. <br />Sump # 91 <br />Sump # <br />Sump # <br />Sump # <br />48" <br />69°4 <br />Manufacturer: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetratiom <br />129= <br />I <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />24" <br />Condition of sump prior to testing: <br />lk <br />Portion of S Tested' <br />Sump <br />Above highest <br />enetretion <br />Above highest <br />Penetration <br />Above highest <br />netration <br />Above higKDfit <br />ersetratiasn <br />Does turbine shut down whet' <br />sump sensor detects liquid (both <br />product and water)9" <br />Yes ❑ No ® NA <br />i <br />❑Yes ❑ No 2 NA <br />[]Yes ❑ No NA <br />? <br />` ❑ Yes ❑ No NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown` 4 <br />l No NA <br />❑Yes ❑ No NA <br />❑Y [1 No NA <br />❑Yes ❑ No NA <br />sail-safe verified to be <br />iYasaf <br />aia f <br />operWatt <br />Yes <br />❑❑ <br />❑ Yes❑N'o®NA <br />❑ Ye&0No0NA <br />❑ Yes ®No1KNA <br />time between applying <br />pi-essurefvacuunilwater and starting <br />test: <br />30 minutes <br />30 minutes <br />30 rninutes <br />30 minutes <br />Test Start Time: <br />10.28am <br />Initial Reading (Rm): <br />2.7805 <br />Test End Time:. <br />10s43am <br />T <br />Ficial Reading (RF): <br />2.3746 <br />Test Duration- <br />15 lig <br />Change in Reading (RF-Rj): <br />0.00100 <br />I Pass/Fail Thresbold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />€1.002 <br />J.._� „ 5 . L0 <br />Was sensor removed for testing? <br />0 Yes ❑ No ❑ NA <br />MYes ❑ No ❑ NA <br />ZYc-, El No ❑ MA <br />M Yes ❑ No 0 NA <br />Was sensor properly replaced and <br />verified faanctional triter testiii ? <br />Yes [] No ❑ NA <br />SYesE1No0NA <br />ZYi ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Comments — (include information on re airs madeprior to testing, and recommended follow-up fbrfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to #By of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SVMCB LG -160) <br />