My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />1Faciltq is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: <br />El Spill Bucket Manufacturer Industry Standard ❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑Pressure El Vacuum Hydrostatic <br />Other (Spec) One hour visual leak test <br />Test Equipment Used: See attached testing procedures tpment Resolution: $ <br />SpW Box # 87 CLU Spill Box 9 91 fin _ Spifl Box # Spill Box it <br />Bucket Diameter & Brand: <br />12" i" 6iltlte 12" Philtite <br />Bucket Depth. <br />12.51' 12.5" <br />wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes 30 Minutes 30 Minutes 30 Minutes <br />Test Start Time: <br />9:19am 9:192 <br />Initial Reading (R): <br />11 '!<" 11 '/a" <br />Test End Time: <br />10:19am 10:19am <br />Final Reading <br />Reading (RF): <br />" 11g.©z� <br />t 1e F <br />Test uratio : <br />�J <br />l/ <br />!sour 1 hour i <br />Change in Reading (RF -R.1): <br />; <br />Criteria: ail Threshold or <br />0.002 0.002 i 0.002 0.002 <br />Commeiats -- (include information on repairs made prior to testing, and a•ecommended follow-up for failed tests <br />
The URL can be used to link to this page
Your browser does not support the video tag.