My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Page 4 of 4 <br />9. :SPILIJOVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />® Other (Specify) One hour visual leak test <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />Spill Box # 87 fill <br />Spill Box # 91 fill <br />Spill Box # <br />Spill Box # <br />Bucket Diameter &. Brand: <br />12" Philtite <br />12" Philtite <br />Bucket Depth: <br />12.5" <br />12.5" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9:19am <br />9:19am <br />Initial Reading (R,): <br />11 '/4" <br />Test End Time: <br />10:19am <br />10:19am <br />Final Reading (RF): <br />11 '/<" <br />11 <br />Test Duration: <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />❑ Pass ❑ Fail <br />® Pass ❑ rail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Faii <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.