Laserfiche WebLink
F. In-Tank Gauging/ SIR Equipment: <br /> JR Check this box if tank gauging is used only for inventory control. <br /> ❑Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in tank gauging equipment is used to perform leak detection monitoring <br /> N Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ®Yes ❑No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑No* was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ®Yes ❑No* Were all probes reinstalled properly? <br /> Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> G. Line Leak Detectors (LLD): Check this box if Leak Detectors are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑NIA For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> *No* (Check all that apply) Simulated leak rate: [:13.0 GPH; ❑0.2 GPH; ❑0.1 GPH <br /> ❑Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑NIA For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> El No* <br /> ❑Yes ❑NIA For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑No* <br /> ❑Yes ❑NIA For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑No* or disconnected? <br /> Yes ❑NIA For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br /> ❑No* est? <br /> ❑Yes ❑NIA For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑No* <br /> ❑Yes ❑No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In section H below,describe how and when these deficiencies were or will be corrected: <br /> H.Comments: <br /> uction System <br /> Monitoring System Certification Page 3 of 3 31111 <br />