My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Items # 18,19,20—Attached are the UST-related procedures and plans that are on site at <br /> all times. Perhaps these were not evident to the inspector on 10/24/01, because most <br /> documents are kept in electronic form and can be viewed and downloaded as needed. <br /> The documents include: the Fuel Tank Monitoring and Management Procedures (Plan), <br /> and the Hazardous Emergency Response Procedures (Plan), and the weekly UST Visual <br /> Inspections performed by site personnel. These copies are included, in paper form, as <br /> Attachments 7, 8, and 9. <br /> The BMC Monitoring Plan (located at the BMC) is included as Attachment b and <br /> includes practices and procedures for monitoring, validating, and responding to UST <br /> alarms. <br /> Sprint recognizes, and is committed to, its obligation for the protection of the environment and <br /> the public. In this present instance, a Certificate of Financial Responsibility is one way it meets <br /> this commitment. Another, is the continuous, constant, and uninterrupted surveillance of the <br /> UST systems and alarms by a department that was created for the sole purpose of monitoring <br /> such systems. And yet another, is minimizing the use of paper and keeping records, plans, and <br /> procedures in electronic form that are easily accessible at the touch of a computer key. <br /> In closing, it is anticipated that Sprint's actions, described herein,will resolve the issues <br /> mentioned in the Inspection Report. If you have any questions, please contact me at (702) 244- <br /> 7212. Thank you. <br /> Yours truly, <br /> xy/ 7 <br /> Nora Galindo, Esq. <br /> Environmental and Health Manager—West <br /> ATTACHMENTS <br /> Cc: Caryl Olmstead w/attachments <br /> Jey Lemes w/attachments <br /> Margaret Pitts w/o attachments <br /> Thad Schneweis w/attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.