My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPS <br /> The UPS systems are to follow the same guidelines as the power and generators. <br /> All work inside UPS cabinets must be done during jeopardy window. <br /> Each UPS is to be evaluated for the extent of alarming being done. <br /> If the current alarming method only provides for a general alarm then it <br /> steps can be taken to have a more extensive is to be noted so <br /> UPS alarming system put in place. <br /> DC Plants <br /> The DC plants voltages and amperages are to be established from DC plant rectifier <br /> meter readings. <br /> Under no circumstances should DC amperage testing be attempted. <br /> Verify the number of DC plants on site and confirm that all plants are being mit <br /> the BAS. monitored b y <br /> Halon <br /> The halon panels are tested on a regular basis utilizing the halon vendor. <br /> Revalidation of halon systems should occur at the time vendor does routine halon <br /> inspection and testing. <br /> Fire Alarm Systems <br /> Some facilities will have additional fire alarm interface equipment. <br /> This equipment is to be tested and inspected by an approved vendor specializing in the <br /> type of equipment located at the facility. <br /> The BAS alarms will be verified at the time of that test. <br /> This is to include any wet or dry sprinkler systems and their attachments. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.