As the chillers and their components undergo routine inspection, maintenance and daily <br /> operation generally problems relating to chillers are already known. <br /> Items to be checked would include water temperature sensors, flow switches and chiller <br /> initiated alarm points. <br /> Fluid Coolers <br /> Check water temperature sensors. <br /> Power <br /> Each phase of the commercial power is to be verified and calibrated. <br /> The electrician is to have measuring equipment sufficient to get voltage and <br /> amperage readings without performing mathematical calculations. <br /> Example: That means if a phase has 3 feeders then the amp meter needs to fit around all 3 <br /> feeders at one time. <br /> It is not acceptable to measure each feeder and add them together. <br /> The exception to this would be that if the physical arrangement of the feeders were such <br /> that is impossible to measure all feeders at once. <br /> If the electrical service switchgear is equipped with factory provided metering devices <br /> than that is an acceptable measuring method. <br /> Generators <br /> Each phase of the generator's voltage and amperage is to be verified as described for <br /> power. <br /> The generator alarms should be tested for actual alarm conditions as much as possible. <br /> It is not possible to test all generator alarms for actual conditions however.. <br /> In those cases the alarm wires serving the BAS are to be shorted as close to the alarm <br /> source as possible. <br /> While this may only verify alarm relays and wiring, it is in some cases the best that can <br /> reasonably be done. <br /> 5 <br />