Laserfiche WebLink
r • <br /> F. In-Tank Gauging/SIR Equipment: J Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 71 Yes No` Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes 7 No` Nas accuracy of system product level readings tested? <br /> Yes 7 No' Nas accuracy of system water level readings tested? <br /> Yes 7 No' Nere all probes reinstalled properly? <br /> Yes 7 No' Nere all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): ✓ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes No` For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check al <br /> N/A that apply) Simulated leak rate: ❑x 3 g.p.h.; ❑x 0.1 g.p.h; 0 0.2 g.p.h. <br /> Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes 7 No` Was the testing apparatus properly calibrated? <br /> Yes 7 No` For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled o <br /> N/A isconnected? <br /> Yes 7 No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fail <br /> N/A 3test? <br /> Yes No` For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes 7 No` ere all items on the equipment manufacturer's maintenance checklist completed? <br /> .In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: Suction/Return system. <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 <br />