Laserfiche WebLink
rSWRCBJanuary,2002 � Job#: 129132 Page of <br /> ;YaWLLL I.LLEIL Elly iIJWVOI[L"yi .Y -UVJLLLVlL.µVt LLl1Lly1 yV1JJUi L Val U4FLA,E %O Vh ALIFL 1 VILIFVLAV"IL LVAL IUL> JAL W01111b. Z�VLLM/l 4+LJLAy Vl <br /> Regulations,Title 23,Section 2637(a)(6)) <br /> s <br /> i <br /> 5. SECONDARY PIPE TESTING Job#: T7029132 <br /> 32 <br /> Test Method Developed By: ®Piping Manufacturer Indusm-Standard © Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Q Pressure Ig Vacuum 19 ll drostatic <br /> ❑❑Other(Specify) <br /> Test Equipment Used: Pressure with a 4"gauge Equipment Resolution: +1-0.25% <br /> Piping Run# gu Piping Run# Return piping Rnn# Piping Run# <br /> Piping Material: DW FRP DW FRP <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 2" 2' <br /> Length of Piping Run: '501 50' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test Reducer Boots Test Reducer Boots <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/t^aeuum/ ater and 15 min 15 min <br /> starting test: <br /> est Start Trme: 10:00 10:00 <br /> fiat Reading(R,): 5 psi 5 psi <br /> Test End Time: 11:00 11:00 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 60 min_. 60 min. <br /> Change m Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or +1_0'L +l-0" <br /> Criteria: <br /> Test Result: <br /> ,... ., <br /> Comments—(include information on repairs made prior to testing and recoiurrreitded folloii,-tip for failed tests) <br />