Laserfiche WebLink
. SWRCB,Jenuary,2002 . � Page of <br /> -� 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING Job#: T7029132 <br /> Test Method Developed By: ❑UDC Manufacturer ❑ Industn'Standard ❑ Professional Engineer <br /> ®Other(Specify) <br /> Test Method Used: ❑[]Pressure ❑o Vacuum ❑M Hydrostatic <br /> pother fSpeci fyl <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Heighrt fromUDC Bottomto Top <br /> of Highest Piping Penetration: <br /> Height from IJDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No ❑1'l'°` ❑yes ❑NO ❑NA El yes ❑No ❑NA C]Yes ❑No ❑NA <br /> product and water)?' <br /> Turbine shutdo,"m response time <br /> Is systemiprogrammed for fail- ❑Yes ❑No ❑NA ❑Yes ❑No [3 NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> e shutdown? <br /> fail-safe verified to be ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> ratiomr* <br /> Wait time beN een applying <br /> pressureh°acuuminater and <br /> starting test <br /> Test Start Tim: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading{RF--Rr}: <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ]Vass []Foal` t [ _Pass Q �atr Pss .;Fst Fait <br /> Was sensor removed for testiyes ❑No d NA ❑Yes ❑No ❑NA a Yes ❑ No 11NA ❑Yes ❑ala ❑NA <br /> mng? ❑ <br /> Was sensor properly replaced and NO <br /> verified functional after testing? ❑Yes 11 ❑ Oyes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑hb ❑NA <br /> Comments—(include information on repairs made prior to testing,and recoriimertdM follolr-up.for failed tests) <br /> NIA <br /> �he entire depth of the UDC is not tested.specify how much was tested. If the answer to any of the questions indicated with an asterisk <br /> jS"110' ar'`NA',the entire UDC must be tested. (See SWRCB LG-160) <br />