My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:32 AM
Creation date
11/2/2018 7:59:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2016-PRESENT.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />5. SECONDARY PIPE TESTING <br />i RECEIVED <br />SEP 2 2 2016 <br />Test Method Developed By: ❑ Piping Manufacturer E Industry Standardrof`esslnnal Fl.'te"rNT <br />❑ Other (Spec) UCI'AH <br />Test Method Used: E Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />Piping Run #Vent Piping Run # Vapor <br />Piping Run # 87 <br />Piping Run # 91 <br />Piping Material: <br />Poly <br />Poly <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Environ <br />Environ <br />Smith Smith <br />Piping Diameter: <br />2" <br />2" <br />3" 3" <br />Length of Piping Run: <br />100, <br />100, <br />100, 100, <br />Product Stored: <br />Gasoline <br />Gasoline <br />N/A N/A <br />Method and location of <br />i in -run isolation: <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings Reducer Boo0ifittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes 10 minutes <br />Test Start Time: <br />10:00 am <br />11:30 am <br />10:00 am 10:00 am <br />Initial Reading (Rt): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test End Time: <br />11:00 am <br />12:30 pm <br />11:00 am 11:00 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test Duration: <br />1 hr. <br />1 hr. <br />1 hr. 1 hr. <br />Change in Reading (RF -Rt): <br />None <br />None <br />None None <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss No detectable Loss <br />Test Result: <br />O Pass ❑ Fail <br />© Pass ❑ Fail <br />® Pass ❑ Fail ® Pass ❑ Fail <br />Comments — (include information on repairs madeprior to testing, and recommendedfollow-upforfailed tests) <br />New 91 test boot installed 20 x 20 spout repair boot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.