Laserfiche WebLink
;SEI® <br />SEP 2 2 2016 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® industry StandardTtm. De `I Fn¢i+a <br />❑ Other (Spec) YYFHi Mt <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />STP Sump # 87 <br />STP Sump # 91 <br />Sump Diameter: <br />42" <br />42" <br />Sump Depth: <br />56" <br />56" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />is" <br />18" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />21 <br />22 <br />Condition of sump prior to testing: <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operational?* <br />❑yes ❑ No ®NA <br />❑Yes ❑ No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />Test Start Time: <br />10:57 am <br />11:51 am <br />Initial Reading (Ri): <br />6.3691 <br />5.3913 <br />Test End Time: <br />11:12 am <br />12:06 pm <br />Final Reading (Rr): <br />6.3695 <br />5.3912 <br />Test Duration: <br />15 min. <br />15 min. <br />Change in Reading (Rr-R): <br />0.0004 <br />0.0001 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />+/-0.00211 <br />Test Result: <br />O Pass ❑ Fail <br />17 Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testis ? <br />R yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any, of the questions indicated with an <br />asterisk (*) is "NO" or "RIA", the entire sump must be tested. (See SWRCB LG -160) <br />