My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 4:15:38 PM
Creation date
11/2/2018 8:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-25-2013 14:46 Service Station Systems 408 938 8e88 P.05 <br /> S.SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hy&siatie <br /> ❑ 0ther(Sp ecify) <br /> Test Equipment Used: 'Gest reducer boots,Nitrogen and gauges Equipment.Resolution: 0.5%of span <br /> Typing Run#87 Piping Run#91 Piping Run#Vent Piping Run#Vapor <br /> Piping Material: Poly Poly fiberglass Fiberglass <br /> Piping Manufacturer: Environ Environ Smith Smith <br /> Piping Diameter: 2" 2" T) T5 <br /> Length of Piping Run: 100, 100' 60' 60 <br /> Product Stored: Gasoline Gasoline N/A N/A <br /> Method and location of <br /> piping-ran isolation: Reducer Boots;rittings Reducer Hoots/Fittings Reducer Boots/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes l0 minutes 10 minutes 10 n mutes <br /> startin test: <br /> Test Start Time: 5:00 am 8:00 am 11:00 am 11:00 am <br /> Initial.Reading(R): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 9:00 ant 9:00 am 12:00 pm 12:00 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: I hr. l hr. I hr. 1 hr. <br /> Change in Reading(RF-Rt): None None None None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss No detestable Loss No detectable Loss <br /> Criteria: <br /> Test Result: El Pass G Fail ® Pass ❑Fail ® Pass 0 Fail M Pass ❑Fail <br /> Comments—(include!nLbr anon on repairs madeprior to lesting, and recommended follow-upfor failed tests) <br /> Installed new Test Boots to Vent &Vapor Return Lints. <br />
The URL can be used to link to this page
Your browser does not support the video tag.