My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 4:15:38 PM
Creation date
11/2/2018 8:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S W RCB,January 2002 Page_Y or <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested X II <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Q Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic <br /> ❑ Other(Sped) <br /> Test Equipment Used: Equipment Resolution; <br /> F{y <br /> Spill Box# Spill Box# Spill Box # Spill Box ii <br /> Bucket Diameter; li <br /> Bucket Depth: f <br /> Wait time between applying <br /> _. ._. <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time; <br /> Initial Reading(R): - <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> --4 <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fair 0 Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) _ <br /> Spill/Overfill Boxes tested with annual Monitoring System Certification. <br /> Paged of; <br />
The URL can be used to link to this page
Your browser does not support the video tag.