Laserfiche WebLink
S W RCB,January 2002 Page_Y or <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested X II <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Q Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum El Hydrostatic <br /> ❑ Other(Sped) <br /> Test Equipment Used: Equipment Resolution; <br /> F{y <br /> Spill Box# Spill Box# Spill Box # Spill Box ii <br /> Bucket Diameter; li <br /> Bucket Depth: f <br /> Wait time between applying <br /> _. ._. <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time; <br /> Initial Reading(R): - <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> --4 <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fair 0 Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) _ <br /> Spill/Overfill Boxes tested with annual Monitoring System Certification. <br /> Paged of; <br />