Laserfiche WebLink
F. I In-Tanl�-Gauging 1 SIR Fquipment: Check this box if tank gauss used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> El Yes ❑ No' Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No` Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In Section H,below,describe how and when these deficiencies were or will be corrected, <br /> Line Leak Detectors(LLD): Q Check this box if LLDs are not installed. <br /> Cam late the followin checklist: <br /> ® Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ NIA Simulated leak rate: Z 3 g.p.h.; 110.1 g.p.h; ❑0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLQ <br /> ® NIA detects a leak? <br /> ❑ Yes ❑ No* For electronic LLbs,does the turbine automaticall shut off if an <br /> NIA Y y portion of the monitoring system is disabled or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automaticallyshut off if an <br /> ❑ NIA Y portion of the monitoring system malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 NIA <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In Section H,below,describe haw and when these deflciencles were ar wll!be corrected. <br /> 1. Comments: <br /> Monitoring System Certification Page 3 of d <br /> 2/21107 <br />