Laserfiche WebLink
s r <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: RANCHO SAN MIGUEL 1409 AIRPORT WAY STOCKTON CA 95205 <br /> ATG <br /> . . . . . . . . . �. O . . . . . .`�. , <br /> X <br /> A P F P . . . . . . . . . . . . <br /> . T . . . . . . . . . . <br /> A=ANNULAR . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE <br /> T=TURSINF. . . . . . . . <br /> V=VAPOR . . . . <br /> %=SENSOR <br /> F=FILL . . . . . . . . . . . . . . . . . . . . . . <br /> . VENTS <br /> . <br /> Bate map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-lank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification <br /> Page 3 of 4 2121/07 <br />