My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 4:15:38 PM
Creation date
11/2/2018 8:03:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2015
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2008-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE*AL <br /> California State Fire Marshal <br /> CODE INTERPRETATION <br /> Date Issued Jufy 27. 2007 Interpretation 66.124 <br /> Topic Healy Clean Air Separator (CAS) Tank as a "uapc-r <br /> Processl_ inrn Unit" _ <br /> Code Sections) CFC 5202.13.3.9 <br /> Requested by Don Iroster <br /> Cettler-Ryan Inc. <br /> 1364 N. McDowell Blvd, Suite 82 <br /> Petaluma, CA 95954 <br /> The California State Fire Marshal has accepted the UL certification of the <br /> Healy Clean Air Separator(GAS) Tank as a "Vapor Processing Unit". 2001 <br /> CFC Section 5202.93.3.9 indicates that the vent termination from vapor <br /> processing units shall be not less than 8 feet above the processing unit <br /> itself. <br /> All of the Heady Installation materials and the California Air Resources <br /> Board Executive Order VR-202-A exhibits indicate that the underground <br /> storage tank pressure vacuum vent valve termination need only be located <br /> 92 feet above grade. No reference is made to the 8 foot separation <br /> requirement. <br /> We have two Questions for your consideration and interpretation: <br /> f. Does the UST pressure vacuum vent valve need to be located 8 feet <br /> above the CAS Tank as indicated on the attached Detail 19 <br /> No. The design of the CAS is such that all vapors from the UST are completely <br /> trapped within the "bladder" contained in the CAS. The vent corning from the <br /> CAS is to vent the interstitial space between the Bladder and the outside wall of <br /> the CAS. (See footnote below) <br />
The URL can be used to link to this page
Your browser does not support the video tag.