My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:31 AM
Creation date
11/2/2018 8:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2004-2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging 1 S1R Equipment: x Check this box if tank gauging is used <br /> or SIR equipment TinvMtOrY i talled,MIMl- <br /> 0 Check this box if no tank gauging <br /> This section must be completed if in-tank gauging equipment is used to perform leak deUmtion monitoring, <br /> Cowfete the following checklist: <br /> ❑ Yes I LlNo* Has all input wiring been inspected for proper entry and termination,including.testing for ground faults? <br /> ❑ yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ yes 1: No* Was accuracy of system product level:readings tested? <br /> ❑ Yes D Na* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> C3 yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> k <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the followin checklist: <br /> Fmayyeeesss <br /> ❑ No* Por equipment start-up or annual. equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NA (Check all that apply) Simulated leak rate: x 3 g.p.h- ❑ ©.1 g.p.h ; ❑0.2 g.p.h. <br /> ❑ NO Were all LLDs confirmed operational and accurate within regulatory requirements`? <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> d No*FFormechanical LLDs,does the LLD restrict pmduct flow if it detects a leak? <br /> LJ NIA❑ No* electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Ili NfA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ® N/A or disconnected? <br /> Yes ❑ No* For electronic LLDs,floes the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> IM NIA or£ails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> M yes ❑ No* Were all items on the equipment manufacturer's ndaluternance checklist completed? <br /> IGa the Secdon H,below,describe how and'When these deficiencies were or will be corrected. <br /> 11. Comments: <br /> UN-036-314 Page 3 of 3 iiev.06/04M <br />
The URL can be used to link to this page
Your browser does not support the video tag.