Laserfiche WebLink
0 0 <br /> momorw System Certification <br /> UST Monitorinu Site Plan <br /> Site Addmss.–1427 Airport Way Stockton 95205 <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . .Q,fr5 . . . . . . . . . . . . . . . . . . . 0 Fi tt <br /> . . . . . . . . Oq . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . - . . . . . . . . 11 . 1 . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . - . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . Ve_ <br /> . . . . . . . . . sornp <br /> be - <br /> . . . . . . . . . . . . . p�u . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> t <br /> . . . . . . . . . . . . . . — . . . . . . . . . . . <br /> . . . . . . . . . . 1 - 1 . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . 1 - 1 . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . 11 . 1 . . . . . . . <br /> . . . . . . . . . . . . . <br /> Date map was drawn; 6/17/05 <br /> limstruMons <br /> T-F you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared, <br /> UN-036-4/4 Page 4—of—4— Rev.O6ffl01 <br />