Laserfiche WebLink
1 <br /> 5. SECONDARY PfPE TESTI G Page 3 al'7 <br /> Test Method Developed By: ❑Piping Manuf curer C_Industry Standard ❑Professional Engineer <br /> f:7 Other(specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> OTestgtaipment Used: Equipmem Riesolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run#tMaterial:Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stared: <br /> Method artd Iocation of <br /> i in -run isolation: <br /> Fait time between applying <br /> pressure/vacuurn4atcr and <br /> stattin test: <br /> Test Start Time: <br /> Initial Reading(RT): <br /> Test End Time" <br /> Final Reading(Rv)., <br /> Test Duration.: <br /> Change in Reading(RF Rs): <br /> Pass/Fail Threshold or i <br /> Criteria: <br /> Test Resuh.- Pass Fail Pass Fail Pass Fail PassFail <br /> CaMtMcOt5 -- incbede information on re airs made prior to testing, and recommended fpllrnv-up for foikod tests) <br /> COmn�nets na r u�r d testins? ► Nave> ej 30 200 __ <br />