Laserfiche WebLink
Page 4 of 7 <br /> 5. B'E'ING SUMP TESTING <br /> Test Method Developed By: M Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: n pressure ❑Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Equipment Resolution: <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hi est Pi r Penetration: <br /> Height frons Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: ' <br /> Portiari of Sump Tested' <br /> Does turbine Aut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed* for fail-safe Yes No NA Yes No NA Yes No NA Yes No 'NTAshutdown? <br /> Was'fail-safe verified to be <br /> operational?* Yes No NA Yes No NA Yes No NA Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(RE): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/>~aiI"threshold or Criteria: <br /> Test Result; ID Pass ❑Fall :]Pass 0 Fail D Pass []Fall i7 Pass , ❑Vau <br /> Was sensor removed for testing? rYes ❑No ❑NA ❑Yes ❑No ❑NA C Yes ❑No ❑NA ❑Yes C1 No ❑NA <br /> Was sensor properly replaced and ❑Yes 7 No 1 NA F_Yes E)No U NA G Yes ❑No E.NA ❑Yes El No O NA <br /> verified functional after testing? <br /> COMMen,tS— include information on re airs made prior to testing, and recomtrmended olloau-tt err ailed tests <br /> Com et ed re uied tests an No tuber 0 2 OS <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to ny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must he tested. (See SWRCB T G-160) <br />