My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:31 AM
Creation date
11/2/2018 8:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2004-2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'• - � � <br /> SWRCR,January 2002 Page 3 of 7 <br /> 5. SFOtONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manlufadum X Industry Standard Fj Professional Engineer <br /> 0 other. (sre�,fy) <br /> Test Method Used: x Pressure ❑Vacimm 0 Hydrostatic <br /> ❑Other(S;Pe :fy) <br /> Test Equipment Used:Air Compmwr and 0-15#Dish gauge Equipment Rmolutior: <br /> Piping Ruo#$1 prd Piping Run##87 vapo Piping Ran#87 vent Piping Run#91 pro <br /> Piping Material: Poly Fiberglass 'Fiberglass Poly <br /> Piping Manufkcturer: Environ A.0.Smith A.O.Smith Environs <br /> Piping Diameter: 2" 3" <br /> Length of Piping lien: 120' 100' 20' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Test bo=at the end Test boots at the ends Test boots at end of 'fest bjots at ends of <br /> piping-ran isolation: of the pie rocs of pipe rums pipe rani pipe rims <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 1.0 minutes 10 uninutes 10 rnilautes <br /> Ota n test: <br /> Test Start Time: 1:00 pin 1:00 pin 1:00pm 2:15 pm <br /> Initial Reading(Rs): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 1:30 pm 1:30 prn 1:30 pm 2:45 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 30 minutes 30 minutes 30 minutes 30 minutes <br /> Change in Reading(RF-R. : 0 charge 0 cllauge 0 change 0 charge <br /> Pass/FaU Threshold or 0 change=pass 0 change=pass 0 change=pass 0 charge=pass <br /> Criteria: <br /> Feat Result: X Pass 0 IFOO x Pass 0 Fsas X pass ©Fail X :Pass :2 Fail <br /> i <br /> CU]W meats—(include information on reams mal prior to testLn& and recommenod qfollow-up or famed wrs <br /> i <br /> 1 <br /> I <br /> I <br /> 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.