Laserfiche WebLink
'• - � � <br /> SWRCR,January 2002 Page 3 of 7 <br /> 5. SFOtONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manlufadum X Industry Standard Fj Professional Engineer <br /> 0 other. (sre�,fy) <br /> Test Method Used: x Pressure ❑Vacimm 0 Hydrostatic <br /> ❑Other(S;Pe :fy) <br /> Test Equipment Used:Air Compmwr and 0-15#Dish gauge Equipment Rmolutior: <br /> Piping Ruo#$1 prd Piping Run##87 vapo Piping Ran#87 vent Piping Run#91 pro <br /> Piping Material: Poly Fiberglass 'Fiberglass Poly <br /> Piping Manufkcturer: Environ A.0.Smith A.O.Smith Environs <br /> Piping Diameter: 2" 3" <br /> Length of Piping lien: 120' 100' 20' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of Test bo=at the end Test boots at the ends Test boots at end of 'fest bjots at ends of <br /> piping-ran isolation: of the pie rocs of pipe rums pipe rani pipe rims <br /> Wait time between applying <br /> pressure/vacuum/water and 10 Minutes 1.0 minutes 10 uninutes 10 rnilautes <br /> Ota n test: <br /> Test Start Time: 1:00 pin 1:00 pin 1:00pm 2:15 pm <br /> Initial Reading(Rs): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 1:30 pm 1:30 prn 1:30 pm 2:45 pm <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 30 minutes 30 minutes 30 minutes 30 minutes <br /> Change in Reading(RF-R. : 0 charge 0 cllauge 0 change 0 charge <br /> Pass/FaU Threshold or 0 change=pass 0 change=pass 0 change=pass 0 charge=pass <br /> Criteria: <br /> Feat Result: X Pass 0 IFOO x Pass 0 Fsas X pass ©Fail X :Pass :2 Fail <br /> i <br /> CU]W meats—(include information on reams mal prior to testLn& and recommenod qfollow-up or famed wrs <br /> i <br /> 1 <br /> I <br /> I <br /> 1 <br /> i <br />