Laserfiche WebLink
SWRCB,January 2002 Page 3 of 7 <br /> 5. SECONDARY PITE T'ESTE%iG <br /> Test Method Developed By: 0 piping Manufacturer X Tndust 7 Standard 0 Professional Engineer <br /> o other(5pecrfy) <br /> Test Method.Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑other(Specrfy) <br /> Test Equipmcnt Used:Air Compressor and 0-15#dial gauge Equiprnent Resolution: <br /> Fiping Run#91 Vent Piping Run# Piping Run# Pipin€,Run# <br /> Piping Material: Fiberglass <br /> piping'Manuficturer: A.0.Smith <br /> Piping Diameter. TI <br /> Length of Piping Run: 20' <br /> Product Stared: Gasoline <br /> Method and location of Test boots at the end <br /> i ' -run isolatiow. of the pipe ran <br /> Wait time between applying <br /> pressure/vacuumlwater and 10 minutes <br /> s#xtin: test: <br /> Test Start Time: 2:15 pm <br /> Initial Reading(RT): 5 psi <br /> Tcst End Time: 2:45 pm <br /> Final Reading(Rv): 5 psi <br /> Test Duration.: 30 minutes <br /> Change in.Reading(Rv-R,): 0 Change <br /> Pass/Fail Threshold or 0 Chan c— ass <br /> Criteria: g _p <br /> Test Result: X Faso 0 Fail ❑ Pass 0 Fail ❑ Pass ❑Fail j i=l ??ass ❑Fail <br /> Comrnenta— (include inform ation on repairs made prior io testing. and recommena¢d follm,2E&rfailed tr-t <br />