Laserfiche WebLink
SWRCB,January 2002 ? ga e 6 of 7 <br /> S. ,FILL RISER CONTAXNWNT S1tJW TESTING <br /> --Facility is Not With Fill Riser Containment Sums 0 <br /> Fill Riser Containment Sum s are PmeM but were Not Tested i_i <br /> Test Method Developed.By: Q Sump Manufacturer X Industry Standard 11 Professional Engineer <br /> ❑Other(Specify) <br /> Test Method.Used: ❑Pressure 1?Vacuum X Hydrostatic <br /> ❑Other EEC*) <br /> Test Equipment Used:Incon TS STS Equipment Resolution: <br /> dill Sam 987 Fill Sininp 491 >p'ila SUME it Fill Sam 4 <br /> Sump Diameter: 42" 42" <br /> S D 48" 4V' <br /> Height from Tank Top to Top of i 2" 12" <br /> Hi est Pi in Penetration: <br /> Height from Ta k Top to Lowest t$" 18 <br /> .Electrical Penetratiam <br /> Condition of sump p;for to Clow Clean <br /> testi <br /> Portion of Sump Tested Full Full <br /> -Sump Material: Fiberglass Fa lass <br /> Wait time between applying 10 minutes 10 Minutes <br /> pressurelvacuum/water and <br /> statin test.- <br /> Test <br /> est:Test Start.Time: 3:40 pm 3:40 22 <br /> Initial Readin 2.6319" 5.5094" <br /> Test End Time: 3:55 E2 3:55 Pm <br /> Final Reamg(RI,); 2.6320" 5.5043" <br /> Test Duration: 15 Minutes 15 Minutes <br /> Chmge in Reading r-Ri): .0001" -.0001 <br /> Pass/Fail Threshold or Criteria: .002 <.p02": ass <br /> Test Reatftt X Pass 0 Fail X lass ❑FAil C! Pass C Fail 7 Pass 7 Fail <br /> 1s there a sensor in the surap? X Yes ❑No X Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Does the sensor alarm when <br /> either product orr water is XYes O No ❑NA XYes ❑No [INA ❑Yes ❑No L NA 7 Y z ❑Flo P NA <br /> detected? <br /> Was sensor removed for testin R? XY% ❑No ❑NA XYes ❑No i"NA ❑Yes ❑No O NA Q Ym ❑No ❑NA <br /> as sensor properly replaced and <br /> verified fimctianai atter tes' ? XYes ❑l�To ❑NA XYes O No ❑NA ❑Y (])tio C3l`1A ❑Ys ❑I�lo -7 NA <br /> Comments—(include infOrTGOOn an re irs made Efor xa Legi t and recommended l 2ny ar ailed tens <br />