My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRON PRODUCTS SISSBS673S 03/31/04 10:011m P. 004 <br /> Flexible • • r <br /> 15.1.3 Terminating Dispenser 16.0 TUBING ASSEMBLIES <br /> Sumps r'': The GeoFlexe piping system incorporates the use of <br /> Test boots installed in these 3/8" plastic tubing for purposes of providing convenient <br /> sumps should be connected to ; access to,and interconnecting of the interstitial space <br /> the 36" (900mm)long test tubes of the GeoFlex-D double wall flexible piping line. <br /> and plugged on the end when GeoFlex--D piping having either swivel or barbed piping <br /> conducting the air pressure test connections and installed with test boots can be fitted <br /> with both test tubes and connector tubes. GeoFlex-D <br /> piping having coax piping connections can be fitted using <br /> only coax test tubes. <br /> 15.1.4 In-line Piping Sump - 16.1 Test Tubes <br /> ConThere are two types of test tubes available for use with <br /> Test boots in :i. GeoFlex-D,or M piping: one for connection to coaxial <br /> Test boots installed in these r aim. ' p a 9' <br /> sumps should be interconnected ' fittings&adapters and the other for connection to test <br /> with a custom length connector boots installed with either swivel or barbed piping <br /> tube. connections. These 36" (900mm)long plastic tubes <br /> assemblies are designed to provide convenient access to <br /> the beginning and end of a GeoFlex-D,or M pipe line for <br /> initial and periodic air pressure integrity testing. <br /> 16.1.1 Coax Test Tubes <br /> 152 Installing Test Boots These tubes are 3/8"nylon which <br /> 9 is 36" long(900mm)with a 114" <br /> After all pipe sections have been inserted into the female brass fitting installed on gip. <br /> containment sumps and before any piping connections one end.The other end has a <br /> are made,the rubber test boots must be installed first. brass male 1/4" NPT threaded <br /> The test boot has an outlet opening located on the bottom connection which connects to <br /> for connection to either test tubes or connector tube as the 1/4" NPT threaded test port <br /> described in section 16 Tubing Assemblies of this product of the coax pipe adapter. <br /> manual.Comply with the following three step installation <br /> procedures for proper installation of the test boots. 16.1.2 Standard Test Tubes <br /> 1521 Removing Band Clamps These tubes are 3/8" nylon Remove both band clamps from the test boot before which is 36" long (900mm)with a 1/4" female brass fitting <br /> installing the rubber boot over the end of the coupled installed on one end.The other <br /> flexible pipe section. and has a male barbed elbow <br /> with band clamp attached for <br /> 1522 Installing Test Boot connection to the 318" port of � <br /> From inside the containment sump,slide the test boot the rubber test boot used with <br /> over the installed pipe section end of the pipe section. metallic couplings&fittings. <br /> 15.2.3 Aligning&Clamping Boot <br /> 16.2 Connector Tubes <br /> Standard Test Boots(Swivel) Reducer Test Boots/Barbed) These short plastic tube ten' <br /> Position the Test Boot with the Position the Test Boot with the assemblies connect one test <br /> outlet port facing down.Align the outlet port facing down.Align the boot to another to reroute the ':�`� <br /> boot so that one clamp is over the boot so that one clamp is over the interstitial space of one flexible ` <br /> green secondary jacket and the green secondary jacket and the pipe section around a tee or s - <br /> other clamp is over the metal other clamp is over the white connector fitting to the next <br /> ferrule of the pipe coupling.Next primary pipe.Next tighten down flexible pipe section. -- <br /> tighten down band clamps. band clamps. <br /> k�bb <br /> 16.2.1 Connected Connector <br /> >° Tubes <br /> After initial integrity testing has <br /> s FR been completed,the connector <br /> tubes can remain connected <br /> if interstitial product flow is <br /> I desired to run the length of the <br /> pipe line back to the tank sump. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.