Laserfiche WebLink
ENVIRON PRODUCTS 9199996739 03/31/04 1O:01am P. 005 <br /> ... �. ._ _ <br /> Flexible r ' • • • Piping <br /> Manual environ, <br /> 16.22 Disconnected Connector Tubes experienced and qualified personnel only. <br /> After initial integrity testing has been completed,the • The pressure gauge should be located in close proximity <br /> connector tubes can be disconnected if interstitial to the pressurizing equipment. <br /> product flow is desired from sump to sump.One end Pressure gauges must have a full scale reading not to <br /> in each dispenser sump should be disconnected from exceed twice the required test pressure. <br /> the test boot. <br /> • Pressure gauges should be accurately and routinely <br /> NOTE:Dispenser sump leak detection is required to tested for reliability. <br /> monitor the integrity of piping,when the connector <br /> tubes are disconnected. 18.2 Pre-Testing Procedures <br /> • The underground storage tank should be isolated from <br /> 17.0 INSTALLING CROSSOVER the piping system prior to hydrostatic or aerostatic testing. <br /> SUPPORTS • Shear valves or riser pipes located under dispensers <br /> Crossover supports should be „ ,., should be sealed with pressure rated plugs or caps. <br /> used at all locations where ''?S`'`,. • Long flex piping runs should be secured at various <br /> flexible pipe crosses over points with backfill material. <br /> another flexible pipe and <br /> at any rigid piping or conduit '' s • All pipe coupling/swivel connections should be <br /> crossovers.These two-piece tightened securely before testing. <br /> supports are installed to both the • The interstitial(secondary)line should be <br /> upper and lower flexible pipe interconnected and fitted with an air gauge. <br /> sections.They must be installed before backfill begins. . All local building,safety and fire codes should be <br /> They are designed to provide a flat crossover surface followed prior to and during testing. <br /> for the upper pipe and also allow for even backfill <br /> compaction around both flexible pipes. <br /> 18.3 Air Pressure Testing <br /> To install,align upper and Procedures <br /> lower support as shown In The air pressure integrity test - ai9 <br /> illustration and fasten together ' s: procedure for the flexible supply - - <br /> using the supplied clips. Be piping is one and one half ;r. <br /> certain not to scratch piping (1-112)times the normal <br /> while installing clips. operating pressure of the <br /> submersible pump,not to <br /> exceed sixty pounds per square <br /> inch (60 psi). Make sure the <br /> flexible pipeline is isolated from <br /> both the underground storage tank and the above <br /> 18.0 TESTING&FlLUNGground product dispenser when conducting this test. <br /> SUPPLY PIPEiii= .< All pressure testing should be conducted by qualified <br /> It is important to properly test the ',,�++'" `. <br /> and experienced personnel. Do not attempt to disconnect <br /> GeoFlex°and GeoVentTM flexible couplings,caps,or plugs unless the air pressure has <br /> Piping priorto backfill to insure been released. <br /> there are no leaks. The following .® . <br /> test procedures are provided `, $ NOTE:Testing requirements must be in accordance with <br /> as a guideline only and the all applicable codes. <br /> manufacturer assumes no ,€, <br /> responsibility or liability for 18.3.1 Air Pressurize <br /> the consequences of any Gradually apply air pressure into the flexible piping line. <br /> testing practices. Do not exceed sixty pounds per square inch (60 psi)or <br /> 416 kPa. <br /> IMPORTANT: Integrity testing with air or gas can be <br /> dangerous and it is very important that the proper 18.3.2 Air Pressure Holding <br /> testing equipment be used and that the pre-testing Maintain pressure for a minimum of three hours,making <br /> procedures be read, sure that there is no drop in pressure. <br /> 18.1 Testing Equipment Note:Significant temperature changes can result in a <br /> pressure reading differential. <br /> • Pressurizing equipment should <br /> be of sufficient size to 183.3 Air Pressure Holding for Coax <br /> accommodate line pressure testing requirements. PRE-BACKFILL Maintain pressure for a minimum of three <br /> • Pressurizing equipment should have controls to gradually hours. POST-BACKFILL Maintain pressure for a minimum <br /> increase pressures. of three hours. <br /> • Pressurizing equipment should be operated by <br /> 23 <br />