My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br /> SWRCB,January 2002 ��_ <br /> 9. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ❑Profession n e <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hy'd'rostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: I?quipmem Rcsolwiun: <br /> UDC# � <br /> _ UDC# UDC# UDC# <br /> UDC :ldanu GiCturel - <br /> UDC Material: <br /> UDC De the <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both <br /> roduct and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?' <br /> Was fail-safe verified to be <br /> o erational?' <br /> Wait time between applying <br /> water and starting test <br /> Test Start Time: <br /> Initial Readin (R,): <br /> Test End Time: <br /> Final Reading RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Was sensor removed for testin ? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-u forfailed tests) <br /> This UST System has no UDC's. <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.