Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 8. PIPING SUMP TESTING MAR 2 7 2015 <br /> Test Method Developed By: ❑Sump Manufacturer ❑Indus Sta Engineer <br /> `� '-'�(�IIRONME �I g <br /> ❑Other(Sped) � r <br /> Test Method Used: Pressure Vacuum ^^X Hydrostatic <br /> Other(Specify) <br /> "lest Equipment t'x.d: Leel Chane Indicator Equipment Resolution: .00_' <br /> Sump#5 Sump#6 Sump#7 Sump#8 <br /> Sump Diameter: 42" 35"Square 35"Square 35"Square <br /> Sump Depth: 36" 48" 48" 48" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 24„ 11" <br /> Hi hest Pi in Penetration: 17" 10" <br /> Heigh[from Tank Top to Lowest <br /> Electrical Penetration: 22" 181924" 23" <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested Water Level 26" Water Level 20" Water Level 26" Water Level 25" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> roduct and water)? <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe <br /> shutdown? yes yes Yes Yes <br /> Was fail-safe verified to be No No No No <br /> o erational? <br /> Wait time between applying water <br /> and startin test: 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> Test Start Time: 10:25 1020 11:10 11.15 <br /> Initial Reading(R,): .001 .001 .001 .001 <br /> Test End Time: 10:55 10:50 11:40 11:45 <br /> Final Reading(Rr): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing' Yes Yes Yes Yes <br /> Comments—(include information on repairs made prior to testing, and recommended ollow up forfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(+)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />