My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cot 02 08 11:39a Reliable Petroleum 209-845-8953 <br /> p,12 <br /> Installation Guide <br /> 7 M:- Installation Procedure <br /> IT 171 il <br /> DO NOT dumps�?,..Fern,continubUsly I Red'Id,dkeI)in <br /> not perforrfn'ie'ak 'tj"e;'sn <br /> - �i <br /> � "PU�Tm�zoinj systems that run continuously; <br /> WIMP; <br /> ALL AIR MUST BE OUT OFTHE SYSTEM FOR THE LEAI<DETECT*5RTO WORK <br /> 71 <br /> PROPERLY. Before installing leak detector in the pump, fill the system with product by <br /> running the pump and delivering product from each dispenser,(s~#? <br /> r.tiq wilbthe fif�esf'' <br /> from the piumpand�Ybrking tothn, Ournp)'Lintil all air is-r§rhov6d ffdffi*sVstem. <br /> Certain regulatory bodies require that leak detectors remain in the system after the lines have been snistalled, <br /> The lines may be purged of air by back-pressuring the lines with an inert gas, such as helium or nitrogen. to a <br /> pressire of 25 psi 1,172 kPa).This may be done at the impact valve under the dispenser. When this pressure <br /> has been reached, the leak detector will be in the open position, By turning on the pump and gradually <br /> blaedkig the gas from the line through a valve at the impact valve of the farthest dispenser,the line may be <br /> purged of air. <br /> Installation Procedure <br /> i. Disconnect power to the submersible pump and relieve pressure before installing or <br /> removing petroleum equipment. <br /> 1. Disconnect power-to pump at the load center.Tag or lock out the breaker to avoid the pump being turned <br /> an accidentally. <br /> 2. Remove the two-inch plug from the too of the Standard pump (see Figure 1 for The Red Jacket leak <br /> detector installation ports). If the two-inch plug is found to be so ticht that cannot be removed, the <br /> submersible sho-uld be removed from the tank and placed in a vise. Remove the functional element <br /> assembly next to the pipe plug.The plug should then come out readily if a large pipe wrench is used. <br /> Replace functional element assembly securely and replace the pump in the tank. (See Step 3 before <br /> replacing pump). <br /> .2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.