My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 02 08 11:39a Reliable Petroleum 209-845-8953 p,13 <br /> Installation Guide Installation Procedure <br /> The Red Jacket <br /> 4 <br /> Q fl installs in this` '"pore:: <br /> �o <br /> Tank vent port <br /> (remove plug to <br /> install vent tubing) <br /> ilz;U01 <br /> "Tio <br /> :jcnm psYx:��rts.mss <br /> Figure 1. FXV installation ports in The Red Jacket ---� <br /> 3. Examine straight bore below two-inch thread for corrosion roughness.It found to be rough, smooth with <br /> fine emery paper. <br /> 4. Apply U111 -classified non-toxic pipe thread sealant to the two-inch threads on the detector. Lubricate c-ring <br /> on the leak detector. <br /> 5. Screw the leak detector into the pump.Tighten with a wrench (top hex is 1-1/4 inch). <br /> E. Installation of vent tube and snap tap connectors, <br /> For FX1 V models <br /> a. Remove 1/4-inch pipe plug from tank test port in the Packer (on 6-inch Big-Flo applications, remove <br /> the 1/4-inch pipe plug from the riser/flange assembly. for The Red Jacket pumps,see Figure 2). <br /> b. Apply a UL-classified ncn-toxic pipe thread sealant to the threads of the a/a-inch NPT straight vent <br /> tube fitting and install in tank test port of the packer. On 6-inch Big-Flo applications,the 1/4-inch NPT <br /> straight vent tube fitting may be installed into the riser/flange assembly. <br /> c. Apply a UL-classified non-toxlc pipe thread ssalant to the threads of the 1/4-Inch NPT 9©-degree vent <br /> tube fitting and install in the leak detector vent opening in the cap of the leak detector- <br /> d. Install the vent tubing into both fittings and tighten per instructions on package. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.