Laserfiche WebLink
Oct 02 08 11:39a Reliable Petroleum 209-845-8953 p,13 <br /> Installation Guide Installation Procedure <br /> The Red Jacket <br /> 4 <br /> Q fl installs in this` '"pore:: <br /> �o <br /> Tank vent port <br /> (remove plug to <br /> install vent tubing) <br /> ilz;U01 <br /> "Tio <br /> :jcnm psYx:��rts.mss <br /> Figure 1. FXV installation ports in The Red Jacket ---� <br /> 3. Examine straight bore below two-inch thread for corrosion roughness.It found to be rough, smooth with <br /> fine emery paper. <br /> 4. Apply U111 -classified non-toxic pipe thread sealant to the two-inch threads on the detector. Lubricate c-ring <br /> on the leak detector. <br /> 5. Screw the leak detector into the pump.Tighten with a wrench (top hex is 1-1/4 inch). <br /> E. Installation of vent tube and snap tap connectors, <br /> For FX1 V models <br /> a. Remove 1/4-inch pipe plug from tank test port in the Packer (on 6-inch Big-Flo applications, remove <br /> the 1/4-inch pipe plug from the riser/flange assembly. for The Red Jacket pumps,see Figure 2). <br /> b. Apply a UL-classified ncn-toxic pipe thread sealant to the threads of the a/a-inch NPT straight vent <br /> tube fitting and install in tank test port of the packer. On 6-inch Big-Flo applications,the 1/4-inch NPT <br /> straight vent tube fitting may be installed into the riser/flange assembly. <br /> c. Apply a UL-classified non-toxlc pipe thread ssalant to the threads of the 1/4-Inch NPT 9©-degree vent <br /> tube fitting and install in the leak detector vent opening in the cap of the leak detector- <br /> d. Install the vent tubing into both fittings and tighten per instructions on package. <br /> 3 <br />