Laserfiche WebLink
SWKCB, January 2002 <br /> Page '7 of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed riy; ❑UDC Manufacturer ❑Industry Standard C Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: _ ❑Pressure ,,�,__. El Vacuum <br /> ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipmept Used: Equipment Resolution: <br /> r UDC# UDC# UDC# UDC# <br /> UDC Manufacturer:, <br /> UDC Material: �� <br /> UDC Depth: <br /> Height from UDC Bottom to.Top <br /> of Highest Pi in Penetration. <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to ` <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑ Yes ❑No a°11u' ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> roduct and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* []Yes °❑No 01NA ❑Yes ,p�No ❑NA E:Yes ❑No El NA n Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yds ❑No ❑NA ❑Yes ❑No `DNA ❑Yes ❑No D NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF?' <br /> Test Duration: .' <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Nail ❑ Pass'`, ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA 11 es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No' ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ❑ Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No Q NA <br /> Comments—(include in armation on repairs made prior to testing, and recommended ollow-u or ailed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer toy of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />