Laserfiche WebLink
S WI'iCB, January 2002 <br /> 6. PIPING SUMP TESTING Page --, of- <br /> Test Method Developed By; <br /> El Sump Manufacturer L1 Industry Standard d Professional Engineer <br /> l <br /> Ll Other(Specify) <br /> _.Task Method Used:..---- ---.�__ ,----_❑_Pressure .-.----. . <br /> ,,,,� _.___Q Vacuums Hydrostatic <br /> ❑Other(Sped) i- <br /> - y <br /> Test Equipment Used: ('.ter I,1„-��'I� ��}�� L ✓� ���� :Y��l� r r <br /> r Equipment Resolution: <br /> Sump# 5` Sump#L Sum # <br /> Sump Diameter: P Sump# <br /> Sump Depth: jfe, J 1` � t;t ew f q 5 f t �`fL( <br /> __. <br /> Sump Material: f + r r r1 if 1 <br /> r l w V' €r4�7 fi �' rV <br /> Height from Tank Top to Top of t �'f y, lee <br /> 5 5 <br /> Hi est Pi in Penetration: Z`{ 1 1 1-711 <br /> r �/ <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: Z21' 2-Lt ,1 2, 31) <br /> Condition of sump prior to testing: Joel o t 1 <br /> Portion of Sump Tested' U r <br /> Does turbine shutdown when v� �er � � ,r Gtr lu�L �`r C�� rLe,-et2s'' <br /> sump sensor detects liquid(both F°Yes ❑No ❑NA Yes 0 No El NA `Yes ❑No 0 NA �Yes 0 No El NA <br /> roduct and water ?” <br /> Turbine shutdown response time NIS �[ ,c <br /> r�� r✓ ekr ,+u� tcK <br /> Is system pro N <br /> Y p grammed far fail-safe <br /> shutdown?" Yes 0 No 1]NA �Ves ❑No ❑NA ,bTYes ❑No ❑NA , yes Q No ❑NA <br /> Was fail-safe verified to be <br /> o erationai?" 0 Yes i?-No 0 NA ❑Yes ,-P-No 11 NA 0 Yes Lj-No ❑NA ❑Yes k10—o d NA <br /> Wait time between a 1 ,ing <br /> pressure/vacuum/ Ater d starting <br /> test; <br /> �rS <br /> Test Start Time: ' 2v /O/,-r cl. <br /> Initial Reading(R): mix Y� , <br /> Test End Time: <br /> Final Reading(RF): <br /> ��-c c°� <br /> Test Duration: •�� ��ct EP <br /> 3Drrc—. tt&4 ryr—ir �rS dlfricrul4 *5 30C�rr2ru �Y5 <br /> Change in Reading(RF-R�; lu O C � <br /> Pass/Fail Threshold or Criteria: ,� <br /> Test Result: Pass ❑Fail 'Pass ❑Fail Pass 0 Fail ,`.<d Pass Q Fail <br /> Was sensor removed for testing? �Jles ❑No Q NA -A-Yes El No El NA <br /> Was sensor properly replaced and �"�Yes 0 No ❑NA fomes []No ❑NA <br /> verified functional a8er testin ? ;®Yes ❑No ❑NA ;B� ❑No ❑NA 1 Yes 11 No ❑NA P Yes ❑No ❑NA <br /> Comments —(include in ormation on repairs made prior to testin , and recommendedfollow-u or failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />