Laserfiche WebLink
Monitoring System Certification <br /> D. Results of'1 esting/Servicing <br /> Software Version Installed: 17.42 <br /> Complete the following checklist: <br /> M Yes ❑ No* is the audible alarm operational? <br /> ED Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Z Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> 0 NIA operational? <br /> Z Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak, fails to operate, or is electrically disconnected? if yes: which sensors initiate <br /> positive shut-down? (Check all that apply) E Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> 0 Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ❑ NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90% <br /> ❑ Yes* ® No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ® Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product; ® Water. if yes,describe causes in Section E,below. <br /> 0 Yes I ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Yes j..Lj No* Is all monitoring a ui mento erational per manufacturer's s ecifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: * Found small amount of water in Tank 1 probe sump. Removed water from sump and placed into <br /> Hazardous waste drum located on-site. *Tank 3 was coverted from (AV-GAS) to,let"A"fuel, Wright Environmental <br /> performed the conversion. <br /> Page 2 of 3 <br />