My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard ❑Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure a Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Tcst Pquij)w,2nt I lscd: Pressure Ciau�es in Psi./Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping X4utcr al: Poly Plastic Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Environ Ameron Ameron Ameron <br /> Piping Diameter: 3" 4" 4" 4" <br /> Length of Piping Run: Approx.6' Approx.6' Approx.6' Approx. 10' <br /> Product Stored: Jet A Jet A Jet A Jet A <br /> Method and location of Test boot at STP#I Test boot at Test boot at Test boot at <br /> piping-run isolation: Not Tested STP Sump#2 STP Sump#3 Return Sump#1 <br /> Wait time between applying Not Tested 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: See Comments <br /> Test Start Time: 9:40 9:50 10:10 <br /> Initial Reading(Ri): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:40 10:50 11:10 <br /> Final Readingj(RrF-R_j): <br /> 3 Psi 3 Psi 3 Psi <br /> Test DurationI Hour i Hour 1 Hour <br /> Change in Re0 Psi 0 Psi 0 Psi <br /> PasslFail ThreNo Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Not Tested X Pass []Fail X Pass ❑Fail X Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Unable to Test Piping Run#1 due to bad boot. When we connected Test Hose to Boot,the Soot split into many pieces. <br /> Recommend Boot be replaced to allow proper seal for Test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.