Laserfiche WebLink
SAN JOA4VN COUNTY ENVIRONMENTAL HEALTSEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION [ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol <br /> PLAN TYPE (� MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moa. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Ageircy Use Oral)) - <br /> FACILITY NAME A. 67. Sf?G/10 Moi. <br /> FACILITY SITE ADDRE-SS �3!� Moa. CITY M05 <br /> r <br /> II. EQUIPMENT TESTING ANY PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mob. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Mol. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this Ian. <br /> IV. TANK MONITORING - <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M14 <br /> \ .CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: N a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M11. <br /> PANEL MANUFACTURER: _Atg _d-�_2n " e[�+ M12, MODEL#: -TL M13 <br /> LEAK SENSOR MANUFACTURER: � GC �[ ?� M14. MODEL#(S): M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) ry9 Y 3go- ya <br /> PANEL MANUFACTURER: M16. MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: Mig. MODEL#(S): M19, <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M2°. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Mal. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): M22. M23 <br /> g.p. g.p.h. { P Y)� <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Ma4. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643:1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY El c.OTHER(Specify): M26. M27 <br /> 6.VISUAL MONITORING DONE: Pa a.DAILY ❑ b.WEEKLY(Requires aganeyapproval) <br /> M?a <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 1`1 a.DRY [Ib.LIQUID FILLED ❑ c.UNDER PRESSURE [Id.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: v M32. MODEL#: Ti-s 3 Sb M33. <br /> LEAK SENSOR MANUFACTURER: W4' MODEL#(5): '~ tr M35 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? LV,a.YES ❑ b.NO M36. <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? '$-a.YES ❑ b.NO M37. <br /> Q 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK 1S DETECTED 9,Q JdGL ` <br /> MLLD MANUFACTURER(s): M38. MOD EL#(S): � fc4rbSlf✓ 9' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: 111411. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: F] a.MINIMUM MONTHLY 0.2 g.p.h. [3b.MINIMUM ANNUAL 0.1 g.p.h. M42 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43, <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M43. M46 <br /> 5.V ISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY' gr c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> •Requirm agency approval ••Allowed r monitoring of unburied emergency generator fuel piping.only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) N148 <br /> SJCEHD-d(07/03)-114 07/23/03 <br />