My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:34 AM
Creation date
11/2/2018 8:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 1999-2007.PDF
QuestysFileName
COMPLIANCE INFO 1999-2007
QuestysRecordDate
9/14/2017 7:34:03 PM
QuestysRecordID
3637281
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—PAGE 2 <br /> VLDISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mso. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Mst. MODEL#: M52. <br /> LEAK SENSOR MANUFACTURER: 'A" MODEL MODEL#(S): Ms<. <br /> WILL DETECTION OF A LEAK INTO THE UDC]RIGGER AUDIBLE AND VISUAL ALARMS? 1p,a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? $ a.YES ❑ b.NO Mss. <br /> WILL FAILURFJDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? Nr a.YES ❑ b.NO Msz <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Mss. MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY M60. <br /> 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII (ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK Mto. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> "VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mso. <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Require l`Os <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of4Mt2"4) �) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> L) 99. ❑ OTHER(Specify): Mai. <br /> I Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when n4eded. <br /> 95,1W5 12404,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC).�y-3 <br /> +30441 and annually thereafter,the "Designated UST Operator"will Vain facility employees in the proper operation and maintenance of the UST systerrllS. This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after iolybr2W45 the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION' <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mas. <br /> X. PERSONNEL RESPONSIBILITIES <br /> ASOF"12604,-THE <br /> TWEti DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> I <br /> HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETE TION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACI ITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b), <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERT ICATION: I certify that the information provided herein Is true and accurate to the best of my knowledge. <br /> OWN PERATOR SEertiU REPRESENTING DATE: Mgr <br /> ❑ tt M9a. s— <br /> operator to D LlL <br /> O ER/OPERATOR NAME(pnnt M93 OWNER/OPERATOR TITLE: M95. <br /> `►h o ru a,'S eus <br /> (Agency Use Only) This plan has been reviewed and:_ Approved [I Approved With Conditions ) [I Disapproved <br /> Local Agency Signature: ��� r' r^�v� Date: <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07!23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.