Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 17 <br /> Com fete the following checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> Y ❑ No* Is the visual alarm o erational? <br /> yes ❑ No* Were all sensors visual] inspected,functional] tested,and confirmed operational? <br /> es 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> —EY yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Ei IV/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NPA monitoring system detects a leak, fails to operate r or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) mp/TY-ench„Sen&ors; Containmenta'Mspenser� Sensors. <br /> Gid you confirm positive shut-down due to leaks and sensor failure/disconnection? I es; ❑ No. <br /> O yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0-11A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what 2ercent of tank ca aci does the alarm trigger? % <br /> ❑ yes* R—NQo. Was any monitoring equipment replaced? If yes,identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E,below. <br /> ❑ yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) El <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring a ui mentoperational per manufacturer's specifications? <br /> *to Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />