My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:34 AM
Creation date
11/2/2018 8:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 1999-2007.PDF
QuestysFileName
COMPLIANCE INFO 1999-2007
QuestysRecordDate
9/14/2017 7:34:03 PM
QuestysRecordID
3637281
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br /> Software Version Installed: 17 <br /> Com fete the following checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> Y ❑ No* Is the visual alarm o erational? <br /> yes ❑ No* Were all sensors visual] inspected,functional] tested,and confirmed operational? <br /> es 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> —EY yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Ei IV/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NPA monitoring system detects a leak, fails to operate r or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) mp/TY-ench„Sen&ors; Containmenta'Mspenser� Sensors. <br /> Gid you confirm positive shut-down due to leaks and sensor failure/disconnection? I es; ❑ No. <br /> O yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0-11A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what 2ercent of tank ca aci does the alarm trigger? % <br /> ❑ yes* R—NQo. Was any monitoring equipment replaced? If yes,identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E,below. <br /> ❑ yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) El <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring a ui mentoperational per manufacturer's specifications? <br /> *to Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.