My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:34 AM
Creation date
11/2/2018 8:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 1999-2007.PDF
QuestysFileName
COMPLIANCE INFO 1999-2007
QuestysRecordDate
9/14/2017 7:34:03 PM
QuestysRecordID
3637281
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-jeck tl�is box if tank gauging is used only for inventory control. <br /> C] (:'heck this box if no tank gauging or SIR equipment is installed. <br /> F. in-Tank Gauging / SIR Egttii�ntettt: <br /> This section must be cornPlete <br /> d if in-tank gauging ecittij)rnent is used to perfol`m leak detection monitoring. <br /> Complete the following checklist: ected for properentry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No <br /> * Has all input wirvfg been insp <br /> ❑ Yes ❑ <br /> No* Were all tank gauging probes visually inspect <br /> for damage and residue buildup. <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested"? <br /> C) Yes ❑ No <br /> Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> D Yes ❑ <br /> No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * <br /> In the Secti°n.H,below,describe how and vvlien these deficiencies were or will be corrected. <br /> D): <br /> L3 Check this box if LLDs are not installed. <br /> G. Line Leak Detectors (LL <br /> Complete the following checklist: <br /> LLD performance? <br /> * Far equipment start-up or annual equipment certification, <br /> was <br /> P leak ©2 g F h to veil P <br /> ❑ Yes 0. No I Simulated leak rate: ❑ l g P <br /> ❑ N/A (Check all that appy) <br /> * re all LLDs confirmed operational and accurate within regulatory requirements? <br /> (� Yes ❑ NO We calibrated? <br /> ❑'Yes ❑-No* Was the testing apparatus property <br /> ❑.Yes ❑ No <br /> * For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> + ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD defects a leak? is disabled <br /> ❑ NIA portion of the monitoring system <br /> ❑ Yes ❑ No* For electronic LL Ds, does the turbine automatically shut off if any. <br /> ❑ NIA or disconnected <br /> ro-yyeess <br /> For electronicdoes the turbine automatically shut offif any portion of the monitoring system <br /> ❑ N/A malfunctions rrr fails a test?❑ No* For electronic LLDs,have all accessible wiritis connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipm�jlt <br /> nufacturcr's maintenance checklist completed? <br /> *In the Section H,below,describe how and e dcfwciencies were or will be corrected. <br /> H. Coln meutS' <br /> �� num <br />
The URL can be used to link to this page
Your browser does not support the video tag.