Laserfiche WebLink
MRR 17 2003 3: 32PM itLnSERJET <br /> 3200 p. 4 <br /> SWRCB,January 2002 <br /> Page 3 of 7 <br /> 5. SECONDARY PIPETESTING <br /> -fest Method Developed By: [X]piping Manufacturer Industry Standard <br /> Professional Engineer I Other(Spect(y) <br /> Test Method Jsed: X Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> rest Equipment Used; Pressure Ga!1-Te Equipment Resolution: <br /> Pi in Run#1 Pi in Run#2 Pi in Run 43 Pi in Run#4 <br /> Pi LmE Material: Fib lass Fiber lass Fiber lass Fiber gl iss <br /> Pi in Manufacturer AMRON AMRON AMRON AMRON <br /> Piping Dimneter: 6 inch 6 inch 6 inch 6 inch <br /> i"c <br /> t <br /> 5 feet 5 feet <br /> Length of Piping Run: 5 feet 5 feet 5 f <br /> Jet-A Fuel <br /> Product Stored: Jet-A Fuel Jet-A Fuel Jet-A Fuel Jet-A Fue <br /> Method and location of piping- Test boots Test boots Test boots Test boots <br /> nm isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN. 5 MIN. 5 MIN. 5 MIN. <br /> starun test, <br /> '0'45 AM <br /> 9 A'AN' <br /> T est Start Ti—me., 9:30 AM 9:45 AM 10-45 AM 11:50 AM <br /> L S <br /> Start <br /> 'n 5 LBS 5 LES <br /> Initial Readin (RI 5LDS 5 LBS <br /> AM I 1 45 AM <br /> 1 0 45 <br /> TestEndTime: 10:30 AM 10:45 AM 11:45 AM 12:50 PM <br /> BS <br /> 5 BS 5L 5LBS <br /> KH��nal Readin (R* 5LBS 5LBS 5LBS <br /> lHR 1HR <br /> Test Duration: 1 H 1 H lHR <br /> Change in Reading(Rf-RI) -0- -0- -0- <br /> Pass/Faif Threshold Or Criteria: -0-CHANGE -0-0�CHANGE -0-CHANGE -0-LOSSXIT <br /> :`Tnt-Resu#;, I pq Pam[ ] Fail, IV] Pass I Fpa�jj�[jxj Pass I I Fail I as$ I F*j1 <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for fined tests) <br /> INSTALLED NEW TEST BOOTS BEFORE RUNNING TEST <br />