Laserfiche WebLink
MAR 17 2003 3: 32PMLASERJET 32000 p- 5 <br /> 1?age 4A of'7 <br /> SwRcI3,January 2092 <br /> b.P1F�TG SUMP TESTING professional <br /> Test Method Developed By: [X] Sump Manufacturer [ ]Industry Standard [ ] <br /> Engineer <br /> [ ]Qiher(Specify) <br /> PressureVacuum IX I Hydrostatic <br /> Test Method Used: ] Other S eci ' <br /> `fest Equipment Used CALI3WELL LEVEL GAUGE Bqut meat Resolution, 0.0025 <br /> Tor Sum #1 Turbine Sum N2 Transition Sum 41 Transition Sutra #2 <br /> 42 INCH 46 INCH <br /> Sum 36 INCII - <br /> Sum Diameter. 4g INCIJE 48 INCH <br /> Sum the 36 INCH 47 INCH - <br /> Sum material- <br /> 21-1/2 <br /> FIBERGLASS FIBERGLASS OINCHLASS <br /> Height from Tank Top to Top of Z1-1l2 INC]I 35 INCH 23 INCH <br /> Hi best Pi in Penetration: 17 INCH 23 INCH <br /> Height from Tank Tap to Lowest 17 INCH 15 INCH <br /> Electrical Pene�atian: DRI' DRY <br /> Condition of sum nor to testin : DRY DRY 24 INCH t30 <br /> NCH <br /> Portion of Sum Tested 23 TNEH 36 INCH YES ND <br /> Does turbine shut down when sump Ixl YES [ ]NO [X]YES [ ]NO [X]YES[ ]NO I <br /> sensor detects liquid(both product& [ ]NA [ ] NA [ ]NA NA <br /> water)? EC. <br /> Turbine shutdown res onse time: 30 SEC. 30 SEC. 30 SEC. -is system programmed for fail-safe [X]YES [ )Nfl [X] YES[ ]NO [x]YES[ 1 ND NAS€ 1 ND <br /> shutdown? [ ]NA l ]NA [ ]NA J 1 ] <br /> Was fail-safe verified to be M YF[ ]NO NAS[ ]NO IX1YAS[ ]NO [[7]N [ 1 No <br /> operational? 5 MIN. <br /> wait time between applying 5 MIN. 5 MIN. 5 IV". <br /> ptessurelvacuumlwater and starting <br /> test: _ P4NCH <br /> Test Start Time: 8:55 AM KINNCH <br /> 9:35 AM <br /> Initial Reading 1 : 23 1NCI1 24 INCH Test End Time: 9:25 AM 10:05 AM 23 INCH 241NCH Final Readin lI : . <br /> Test Duration: 30 MIN. 3D MLN.Change in Readin Rf--R] -0-PaSslFail Threshold or Criteria: Less tan 0.0025 in 30 0025 in 30 Less than 0.0025 in 30 Min, Leas than 0,0025 in 30 <br /> Min. Min, Min. <br /> K SASS A— €X] PASS [ ]'--- CIi] PASS 1 )_FAIL [K 1'l'A S[ ]>NO <br /> Test:' . sttl#c [ � I 1 x YES [ ]NO <br /> Was sensor removed for testing? [x ]YES { ]NO [X l YES I 1 NO Ix 1 15 [ )NO [ 1 <br /> NA NA NA [ NA <br /> Was sensor properly replaced attd [.X]YES [ ]NO [X]YES [ ]NL] € 1 YES I l ND [X]YES[ ]NO <br /> 1 NIA INA <br /> verified functional after testin ? [ ]NIA l 1 NIA [ [ <br /> Comments—(include inf0rmation on repairs trade prior to testing,and recommended follow-tip for fEdled tests) <br /> NEW TEST BOOTS WERE INSTALLED. CHECKED AND SEALED ALL ELECTRICAL FITTINGS AND <br /> PENETRATIONS. <br /> 1 1f the entire depth of the sump is not tested,specify how much was tested. If the answer to anv of the questions indicated with an asterisk('}is "NO"or <br /> "NA",the entire sump must be tested (SWRCB LG-160) <br />