Laserfiche WebLink
MAR 17 2003 3: 33PM LRSERJET 3200 P E <br /> SWR.CB.January 2002 1?age 4B of 7 <br /> 6.PIPING SUMP TESTING <br /> est Method Developed By: lX} Sump Manufacturer [ ]Industry Standard [ ] Professional <br /> T <br /> Engineer [ }Other(Specify) <br /> Test Method Used. E l Pressure t ] <br /> Vacuum [X 1 Hydrostatic <br /> Other eci <br /> ET�e�st�F&u-ienlUsed: CALDWELL LEVEL GAUGE Equt ment Resolution: <br /> P[ in Sum #1 Pi in Suss #2 Stam #I 5ut> #2 <br /> 42 INCH <br /> Sum Diameter: 42 INCH – <br /> Sum D 42 INCH 48 INCH <br /> Sung Mater;al. F1}381tGLASS FIHCRGLASS -._. <br /> Height from Tank Top to Top of 23 INCH 23 INCH <br /> Hi est Pi in Penetration: <br /> Height from Tank Top to Lowest 23-1/2 INCH 20 INCH <br /> Electrical Penetration: <br /> Condition of SuMD prior to WStin : DRY DRY <br /> Portion of Sum Testedl 24 INCH 24 INCH YES i I NO <br /> YgS [ ]NO X YFS [ ]NO I ]YFS[ ]NO [ ] <br /> Does turbine shut down when stoup �]NA [ INA [ NA [ �NA <br /> sensor detects liquid(bath product& [ ] <br /> watts)? <br /> ! Turbine shutdown response time: 30 SIC. 30 SEC. YES[ ]NO [ ]YES[ ]NO <br /> ! Is system programmed for fail-safe [X]—]YES [ ]NO [xI YES[ ]1+10 [] <br /> shutdown? I INA [ ]NA I INA <br /> [ INA <br /> Was failsafe verified to be [X]YES[ ]NO [X]YES[ ]NO I]YFS 1 ]NO [ ]YFS[ ]NO <br /> .! o ational? [ INA [ INA [ INA [ INA <br /> Wait time between apQlying 5 MIN. 5 MIN. <br /> pressure)vacuumlwater and starting <br /> test: <br /> Test Start Time: 12:45 PM 11:35.A1uvi <br /> Initial Readin Rl : 24 INCH �24 INCH <br /> Test End Time: 1:15 PM 12:05 PM <br /> Final Readin 24 INCH 24 INCH <br /> Test Duration: 30 MTN. 30 MITI. <br /> Chan a in Readin Rf-RI 0- -0- <br /> ass/Fail Threshold or Criteria: PASSED PASSED _ <br /> ]x.J. :aSfi [ ]FA1L JL SS t ].FAIL f JPA <br /> ss:X )rto <br /> Was sensor removed for testing? [X 1 YES [ ]NO [X]YES f }NO L I YES [ ]NO [ ]YES I ]NO <br /> NA NA <br /> i YFS [ ]NO [XI'YES [ 1 No []YES [ )NO [ I YES[ )NO <br /> Was sensor properly replaced and [ 1 <br /> verified functional after testing' [ ]NIA [ ]'NIA [ ]NIA [ INA <br /> Comments—(include information OR repairs made prior to testing,and recommended follow-up for Coiled tests) <br /> NEW TEST HOOTS WERE INSTALLED. CHECKED AND SEALED ALL ELECTRICAL FITTINGS AND <br /> PENETRATIONS. <br /> i <br /> I <br /> I if the entire depth of the sump is not tested specify howmuch was tested if the answer to mY of the questions indicated with an asterisk(')is "NCr or <br /> -NA',the entire sump must be tested. (SWRCQ LG-160) <br /> I <br /> I <br /> l <br /> I <br /> I <br /> I <br /> II <br /> i <br /> 1 <br /> I <br /> I <br /> I <br />