My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:36:20 PM
Creation date
11/2/2018 9:07:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\BILLING 2013 - 2015.PDF
QuestysFileName
BILLING 2013 - 2015
QuestysRecordDate
1/23/2018 5:52:37 PM
QuestysRecordID
3769220
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION M ].NEW PLAN _ <br /> ❑ 2.CHANGE OF INFORMATION Mot <br /> PLAN TYPE Iff MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mol_ <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME `' r <br /> FACILITY SITE ADDRESS y7SI S 14/ PoxI w M00 CITYS7© m°s_ <br /> II. EQUIPMENT TESTING AN13 PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Moe, <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED PO I.ANNUALLY ❑ 99.OTHER(Specify): Mm. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mm. <br /> �f 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY �,b.LIQUID FILLED ❑ a UNDER PRESSURE ❑ d.UNDER VACUUM Mr. <br /> PANEL MANUFACTURER: �IE6ir71Ei? .C�co% T4S-dfD M13. MODEL#: it TLS S.50 M13. <br /> LEAK SENSOR MANUFACTURER: M14. MODEL#(S): MI5_ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: .vZIA M16. MODEL#: M11, <br /> IN-TANK PROBE MANUFACTURER: MIa. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Mau. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M31. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): Mn. Mn. <br /> ve<6k <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 MN <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS mu. <br /> 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY c.OTHER(Specify):.1 -f� W6_ Mn <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(aeyui,rs eamcya..man <br /> ❑ 99.OTHER(Specify) Mas. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> [� 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYFRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT I�S, ;,:I a.DRY ❑ b.LIQUID FILLED [I c.UNDER PRESSURE [_1d.UNDER VACUUM M31 <br /> (� . <br /> PANEL MANUFACTURER* _ 6�6712 1 APQOT M31 MODEL#: TZ-r- U-0 M33' <br /> LEAK SENSOR MANUFACTURER: (ZonT MJ6. MODEL#(S): ZfY3G0-208 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? [A a.YES ❑ b.NO M36. <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? P0 a.YES ❑ b.NO MA. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): /=G 7ai-2 D Mia. MODEL#(S): S7A. M La M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M4n MODEL#: MU. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M43. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO m43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44 <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46 <br /> ❑ 5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY" ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** Mor. <br /> e Require'.'app w •.Allowed for monimdna of imbw emeswn arnamor fuel pipirt,miy per HSC§3538I.N6X3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mae. <br /> SJCEHD-d(07/03)-1/4 07/27/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.