My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:36:20 PM
Creation date
11/2/2018 9:07:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\BILLING 2013 - 2015.PDF
QuestysFileName
BILLING 2013 - 2015
QuestysRecordDate
1/23/2018 5:52:37 PM
QuestysRecordID
3769220
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. ..i <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) msn. <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Msh. MODEL#: M52 <br /> LEAK SENSOR MANUFACTURER: Mss. MODEL#(S): M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO mss <br /> WILL FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M17 <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Oowo mss. MODEL#(S): &2.eoO M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Regwme agm,MpmvW) Mho <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ L WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK MID_ <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) 1,180. <br /> L THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(AwwNde&*&ZUAW44) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify): Met. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By July 1,2004,this facility will have a"Designated UST Operator'who has passed the operator exam administered by the International Code Council(ICC). By July <br /> 1,2004,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This <br /> training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the leak detection equipment. <br /> The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2004,the initial training will be conducted within 30 days of the date of hire, <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 7/1/2004,THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATURE REPRESENTING DATE. ms1. <br /> ❑Owner mw. <br /> ❑Operator <br /> OWNER/OPERATOR NAME(print): M92. OWNER/OPERATOR TITLE: M9a' <br /> (Agency Use Only) is p as enre 'ewed and: ❑App rov ❑Approved With Conditions e+/❑Disapproved <br /> Local Agency Signatu Date: J_o,J <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.