My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Installation <br />These steps are not a substitute for the detailed <br />installation steps contained in the fo IloW ng pages. <br />DO NOTATTEMPT TO INSTALL THIS PRODUCT BASED <br />ONLY ON THE SUMMARIZED STEPS LISTED ON THIS PAGE <br />1) Read the entire manual front to back, read carefully. Do not just view images. <br />2) Evaluate the sump, ensure sump material is FRP, and the piping is FRP or conduit. <br />3) (Remove any necessary components that will obstruct your access to the sump wall. <br />Excavate adequate area on outside of all fittings you will install. <br />4) Clean each sump. Remove all contaminants, water and debris, Ensure each sump <br />will be completely dry during all installation steps. <br />5) Secure conduit endpoints so they do not move or act as a lever. <br />6) Remove the interior boot and all of it's components or sealants from the wall and pipe. <br />7) Push existing bolts back into the backfill. Do not damage the sump wall doing this. <br />8) Properly protect the pipe or conduit against damage. <br />9) Abrade the interior of sump wall around hole until bare fiberglass is shown. <br />10) Clean, dry and rough up pipe or conduit surface in preparation for bonding. <br />11) Dust off all abraded surfaces with compressed air. <br />12) Dry -ft your fittings for clean fit against the wall and piping. Mark alignment stripe <br />across the fitting halves and the sump wall with a permanent marker. <br />13) Bond split fitting to the interior of sump by manually pressing fitting halves <br />firmly against the sump wall using hand strength. <br />14) Bead excess adhesive around primary seam at the wall and at the pipe. <br />15) Use acetone to clean the face of each fitting to look like a new install. Clamp halves <br />together tight and re -clean any adhesive that oozes. <br />16) Allow adhesive to fully cure before testing fitting installation. Do not disturb while curing! <br />17) Mandatory Pressure/soap test to verify the fitting installation is good. <br />6 ii -F -Series -Retrofit -S -13B <br />
The URL can be used to link to this page
Your browser does not support the video tag.