My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />STEP 8 <br />• <br />BEAD ADHESIVE <br />HEAV LY ON ALL SEAMS <br />31600 DEGREES AROUND <br />F rFTNG BEFORE <br />CLEANUP <br />PIPE CLAMP <br />SEAT. YOUR FITTING <br />�- A E BODY TOGETHER. <br />COMPLETE ❑ <br />Stick this assembly to the wall and apply a strong pressure to push the halves <br />together and against the wall, aligning the marked stripe. When joined, rotating <br />the fitting back and forth helps. <br />Adhesive should ooze from every seam and joint while pushing the fitting halves <br />together against the pipe and wall. Clean the face of the fitting with acetone or <br />equivalent and remove excess adhesive. You want the fitting clean enough to <br />remove the pipe clamp after the fitting cures. <br />Use provided pipe clamp to secure the fitting halves to each other. More adhesive <br />may ooze from the split seams as you tighten, re -clean as necessary. <br />LET THE FITTING(s) CURE DCS NOT CAUSE PIPE <br />OR CONDUITS TO MOVE OR TWIST DURING CURE <br />After a full cure, remove the pipe clamp holding the two fitting halves together. If it is <br />too difficult to remove and appears to be bonded in place, do not force it off. <br />STEP 9LAKE TESTING (Water Testing): <br />After the F -Series Retrofit -S Fittings are installed and have fully cured, water level test to a <br />maximum of 2" above the highest penetration fitting on the sump. Follow local regulations. <br />13 ii -F -Series -Retrofit -S -13B <br />
The URL can be used to link to this page
Your browser does not support the video tag.