My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 1 1.25a JP Petroleum Service <br />0 <br />916-372-4873 p.4 <br />I- <br />ECEIVE <br />UST SYSTEM RETROFIT OR REPAIR �i " 2 6 2013 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained bHDiR®NENTldl <br />ucnoru ncono-reer_Kir <br />1. Site reap enclosed? YES[] ND`K <br />2 <br />3. <br />Submit copies of IGC Service Technician and/or Installer's certificate and all manufacturer training certricates for each <br />person installing or testing any component that is repaired or replaced, Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram brawn <br />to scale shoving location of repairs and/or replacements. if repairing a component., describe how this will be done. (if <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use tate UST Installation Application <br />pages 4-8 as necessary for a timely plan review): ` <br />F7t+i <br />A, ✓t m G ��'� ?J Ct <br />A -U Cf - <br />I2 <br />I2iALr <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />j�rcl z f j-7 <br />tb <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.