Laserfiche WebLink
STEP 6 (COMPLETE EI) <br />--; r <br />SPACKLE THE INTERIOR <br />- - -- -SOLID-WITH AIYHEsiv <br />FLUSH ON ALL EDGES <br />ADHESIVE APPLIED TO <br />ALL CONTACT SURFACES <br />FOR CURVED WALLS: <br />Apply Bravo adhesive to all Contact Surfaces; between both halves <br />of the curved flange or wedge where they contact each other, the pipe, the wall, <br />and the face of the flange that will contact the wall. Stick this assembly to the <br />wall by firmly applying manual pressure. Make sure to align the marked stripe. <br />Use provided zip -tie to lock these halves together tightly. In weather below 90°F <br />this should remain in place without any assistance while you prepare the body <br />for gluing. <br />11 i i -'i= -Se H es -Retrofit -S-13 B <br />