My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 0 RECEIVED <br />SWRCB, January 2002 D�1 913-- <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING 11 <br />Test Method Developed By: ❑ UDC Manufacturer Industry Standard X Prof WV Ml FMNVM C11 IN4 Ll <br />HEALTHDEPARTMENT <br />ri Other (Spec) <br />Test Method Used: ❑ Pressure V rcuum X Hydrostatic <br />Li Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 1 <br />ll lK' # <br />UDC # <br />L!DC # <br />UDC Manufacturer: <br />Bravo <br />UDC Material: <br />Coated Steel <br />UDC Depth: <br />9" <br />Height from UDC Bottom to Top <br />Enters from bottom <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Enters from bottom <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry <br />-testing: <br />Portion of UDC Tested <br />Water Level 7'✓:" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />Yes <br />and water)?` <br />Turbinene shutdown response time <br />Turbine <br />Not Alarmed <br />Is system programmed for fail- <br />Yes <br />safe shutdown?` <br />- <br />Was fail-safe verified to be <br />No <br />operational?* <br />Wait time between applying <br />5 Minutes <br />water and starling test <br />Test Start Time: <br />12:25 <br />Initial Reading (R`): <br />.001 <br />Test End Time: <br />12:55 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005130 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and <br />Yes <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk N is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.