Laserfiche WebLink
0 <br />SWRCB, January 2002 <br />nmr <br />0 <br />Page _ of <br />,, JL'�.Vl\Lt11\i auu a <br />Test Method Developed By: X Piping Manufacturer -. Industry Standard 1� Professional Engineer <br />I Other (Specify) <br />Test Method Used: X Pressure LL Vacuum ❑ Hydrostatic <br />' Other (Spec) <br />Test Equipment Used: Pressure Gauge in Psi/Nitrogen <br />Piping Run # t Piping Run # <br />Piping Material: Fiberglass <br />Piping Manufacturer: Smith <br />Equipment Resolution: <br />1/] 0 x 15 Psi <br />Piping Run # <br />Piping Run # <br />Piping Diameter: <br />Length of Piping Run: <br />3" <br />Approx. 12' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sum <br />Wait time between applying <br />pressure and starting test: <br />IOMinutes <br />Test Start Time: <br />9:15 <br />Initial Reading (Ri): <br />3 Psi <br />Test End Time: <br />10:15 <br />Final Reading (RF): <br />3 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />Test Result: <br />Pass <br />Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />