My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />SWRCB, January 2002 Page _of_ <br />w.� oriw,in TCCTiN/_ <br />Test Method Developed By: ❑ Sump Manufacturer L Industry Standard X Professional Engineer <br />Other (Specify) <br />Test Method Used: C Pressure-:. Vacuum X Hydrostatic <br />-1 Other (Specify) <br />Test Equipment Used: Caldwell Level Change Indicator <br />mp # 1 Sump # <br />Equipment Resolution:.002 <br />Sump # <br />Sump # <br />Sump Diameter: <br />Sump Depth: <br />'h" <br />!Fiberglass <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />20" <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />Water Level 29" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and waterg. <br />Yes <br />Turbine shutdown response time <br />Not Alarmed <br />is system programmed for fail-safe <br />shutdown? <br />Yes <br />Was fail-safe verified to be <br />operational?* <br />No <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />Test Start Time: <br />9:20 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />9:50 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />Yes <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Comments (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.